SNF Emulsions Control Room

Interior build out of 6,250 SF space including Switchgear Room, Control Room, and Laboratory to support a 63,000 SF Process Facility.  Construction included a 2-hour fire rated separation wall between process activities and the occupied space, redundant positive pressure HVAC system, spray foam insulation, sprinkler system, epoxy flooring, lab casework and fume hoods.

SNF Flopam
Plaquemine, LA
January 2019
April 2019
6,250
Industrial