SNF Emulsions Control Room
Interior build out of 6,250 SF space including Switchgear Room, Control Room, and Laboratory to support a 63,000 SF Process Facility. Construction included a 2-hour fire rated separation wall between process activities and the occupied space, redundant positive pressure HVAC system, spray foam insulation, sprinkler system, epoxy flooring, lab casework and fume hoods.
![](https://mcdonnel.com/wp-content/uploads/2020/01/key.png)
Client:
SNF Flopam
![](https://mcdonnel.com/wp-content/uploads/2020/01/l-shaped-ruler.png)
Architect:
Waldemar S. Nelson and Company, Inc.
![](https://mcdonnel.com/wp-content/uploads/2020/01/location-pin.png)
Location:
Plaquemine, LA
![](https://mcdonnel.com/wp-content/uploads/2020/01/blank-calendar.png)
Start Date:
January 2019
![](https://mcdonnel.com/wp-content/uploads/2020/01/full-calendar.png)
Completion Date:
April 2019
![](https://mcdonnel.com/wp-content/uploads/2020/01/sq-ft-arrows.png)
Square Footage:
6,250
![](https://mcdonnel.com/wp-content/uploads/2020/01/filebox.png)
Categories:
Industrial
![](https://mcdonnel.com/wp-content/uploads/2020/01/gear.png)
Programmatic Functions:
- Switchgear
- Control Room
- Laboratory