< View All Projects

KIK BioLab Low Bay Warehouse

The KIK BioLab Low Bay Warehouse is designed for product handling and storage with spaces for casing, palletizing and racking, and a 24-hour storage area. The warehouse is a Pre-Engineered Metal Building structure with a portion of the building’s footprint occupied by a seven-level Process Tower, which was not part of this project. After Hurricane Laura swept through the Lake Charles area and burned the plant to the ground in 2020, The McDonnel Group was pleased to handle this project, which was part of KIK’s efforts to rebuild the plant.

 

Low Bay Warehouse constructed by The McDonnel Group
Low Bay Warehouse constructed by The McDonnel Group
Industrial Warehouse Construction by The McDonnel Group
KIK Low Bay Warehouse - exterior
KIK Low Bay Warehouse Bays
KIK Low Bay Warehouse Construction
previous arrow
next arrow
KIK Low Bay Warehouse - exterior
KIK Low Bay Warehouse Bays
KIK Low Bay Warehouse Construction
previous arrow
next arrow

Client:

KIK Consumer Products

Architect:

Gensler Architects

Location:

Lake Charles, LA

Start Date:

November 2021

Completion Date:

March 2022

Square Footage:

50,000

Categories:

Pre-Engineered Metal Building Construction
Warehouse Construction
Industrial Construction
New Construction

Ready to get started?

Not sure how to select a contractor?
Download our free qualification guide!

Don’t know where to start with your project?
Download our free startup checklist!

[powr-social-feed id="9992eb36_1566415377"]
F
R
E
E

G
U
I
D
E
S
C
L
O
S
E