< View All Projects

American Styrenics MCC Refurbishment

This industrial restoration project refurbished the existing MCC buildings in American Styrenics‘ HVSB unit in St. James, Louisiana. Work included repairing and replacing the existing gravel roof system with a brand new 60 mil roof system and associated sheet metal to protect major high voltage components for the future. McDonnel also detached the capacitor cover structural steel beams from the CMU exterior of the building that was causing shifting and cracking in the CMU, installed new footings and a concrete slab around the existing capacitors, and repaired and replaced cracked CMU around the exterior of the building. All industrial restoration work was completed while the 16kva remained active.

Industrial Restoration of HSVB by The McDonnel Group
Industrial Restoration of HVSB Roof by The McDonnel Group
Industrial Restoration - HVSB
Industrial Restoration - HVSB Roof
previous arrow
next arrow
Industrial Restoration - HVSB
Industrial Restoration - HVSB Roof
previous arrow
next arrow

Client:

American Styrenics

Architect:

Ragman, Aderman & Associates

Location:

St. James, LA

Start Date:

June 2021

Completion Date:

October 2021

Square Footage:

1,826

Categories:

Industrial Construction
Industrial Restoration

More Information:

Design-Build

Ready to get started?

Not sure how to select a contractor?
Download our free qualification guide!

Don’t know where to start with your project?
Download our free startup checklist!

[powr-social-feed id="9992eb36_1566415377"]
F
R
E
E

G
U
I
D
E
S
C
L
O
S
E