McDonnel worked on this project at Entergy’s St. Charles Power Station through a contract with CB&I. The project included two buildings located at the St.Charles Little Gypsy Power Generation Plant. This is a Greenfeld power generation facility built in Montz, LA. The project includes a 21,000 SF, 2-story, high-bay structure. The Administration, Control Room, Warehouse building (ACW) is the primary operation support facility for the new power station. The ACW is a 60’ x 260’ multipurpose insulated structure with a 1:12 shed roof pitch. The second building is a 4,800 SF de-mineralized treatment building (DWT) which is the primary water facility for the new power station.

CB&I Entergy (6)
CB&I Entergy (1)
CB&I Entergy (2)
CB&I Entergy (3)
CB&I Entergy (4)
CB&I Entergy (5)
CB&I Entergy (7)
CB&I Entergy (8)
CB&I Entergy (9)
CB&I Entergy (10)
CB&I Entergy (11)
previous arrow
next arrow
CB&I Entergy (6)
CB&I Entergy (1)
CB&I Entergy (2)
CB&I Entergy (3)
CB&I Entergy (4)
CB&I Entergy (5)
CB&I Entergy (7)
CB&I Entergy (8)
CB&I Entergy (9)
CB&I Entergy (10)
CB&I Entergy (11)
previous arrow
next arrow

Client:

Entergy St. Charles

Architect:

WDG Architects | Engineers

Location:

Montz, LA

Start Date:

July 2017

Completion Date:

August 2018

Square Footage:

25,800

Categories:

Industrial

Programmatic Functions:

  • Administration
  • Control Room
  • Warehouse
  • De-mineralized Treatment
Ready to get started?

Not sure how to select a contractor?
Download our free qualification guide!

Don’t know where to start with your project?
Download our free startup checklist!

[powr-social-feed id="9992eb36_1566415377"]
F
R
E
E

G
U
I
D
E
S
C
L
O
S
E