< View All Projects

Shintech SPP3 Central U810 & G901 Switchgear Buildings

The Shintech Switchgears Project was design-build consisting of two switchgear buildings as part of Shintech’s Phase 3 Expansion Project. Building U801, which is a 13,000 SF and Building A901, which is 5,000 SF, included the development of 140,000+ SF sites including transformer yards, mechanical yards, pipe rack systems, roads, driveways, and sidewalks. The Switchgear Building included coordination of the Owner’s power requirements into the design including an access floor system, cable trays, bus ducts and steel structures to support all of the electrical infrastructure.

previous arrownext arrow
Slider

Client:

Shintech Louisiana, LLC

Architect:

Crump Wilson Architects

Location:

Plaquemine, LA

Start Date:

September 2019

Completion Date:

May 2020

Square Footage:

18,000

Categories:

Industrial

Programmatic Functions:

  • Switchgear
  • Office Space
  • Electrical Controls
  • 140,000 SF Site Development
  • Transformer Yards
  • Mechanical Yards
  • Pipe Rack Systems
  • Roads & Driveways
Ready to get started?

Not sure how to select a contractor?
Download our free qualification guide!

Don’t know where to start with your project?
Download our free startup checklist!

[powr-social-feed id="9992eb36_1566415377"]
G
E
T

S
T
A
R
T
E
D
C
L
O
S
E