< View All Projects

Shintech SPP3 Central Control

The Central Control Room Project was a design-build consisting of a blast resistant Central Control Room as part of Shintech’s Phase 3 Expansion Project. Building G801, which is a 46,000 SF Control Room Building including 2 laboratories, 22,000 SF of raised access flooring, Control Room, Offices, and Locker Rooms. The project included the development of a 360,000+ SF site including a transformer yard, backup generator, mechanical yard, pipe rack systems, driveways, sidewalks, loading ramps and parking. The Central Control Room included coordination of the Owner’s power requirements into the design including access floor system, epoxy flooring, laboratory infrastructure, clean agent suppression system, cable tray supports, bus ducts, and steel structure to support all electrical infrastructure.

 

previous arrow
next arrow
previous arrownext arrow
Slider

Client:

Shintech Louisiana, LLC

Architect:

WDG Architects | Engineers

Location:

Plaquemine, LA

Start Date:

September 2019

Completion Date:

September 2020

Square Footage:

46,000

Categories:

Industrial

Programmatic Functions:

  • Three (3) Control Rooms
  • Two (2) Laboratories
  • Administration
  • Conference Space
  • Kitchen
  • Switchgear
  • Storage
Ready to get started?

Not sure how to select a contractor?
Download our free qualification guide!

Don’t know where to start with your project?
Download our free startup checklist!

[powr-social-feed id="9992eb36_1566415377"]
G
E
T

S
T
A
R
T
E
D
C
L
O
S
E